Project
Provide and Install Booster Pump in Marrakh (Phase 2)
Client: Public Authority for Water- Diam man
About the client
Construction of water supply system for Hadesh village, Wadi Mistal, Wilayat Nakhal. Construction of 2 nos. Pump stations including supply and fixing of pumps, fittings, system automation, supply and installation of 5000 Gal HDPE tanks 6 nos. laying of 100 DI pipeline in hilly area 2300 m length.
Scope of Service
Supply and Installation of booster pump in Marrakh (phase-2).